A residential new build in a city block: three concrete shell houses in scaffolding round a courtyard with a tower crane

Construction Site

A residential new build: 16 flats in three houses round a shared courtyard, closing a gap in an old city block. The shell stands to the third floor, House 3 gets its top slab next, and the tower crane in the courtyard serves all three houses. The topping-out ceremony is on 11 December 2026; the first flats are handed over in autumn 2027.

Visitors and buyers: the Sales Office and the Show Flat are in House 1. Enter from the street on the east side, under the scaffold tunnel; the way is accessible and the lift runs to the Show Flat on the first floor. The Visitor Car Park is beside the entrance, with two accessible bays and a charging bay.

Contractors: sign in at the Site Office before you start. Walk in through the Main Gate on the footway at the south-west corner, have your helmet, vest and boots checked at the PPE Station and follow the paved walkway. Never walk on the site road: cross it only at the marked crossing.

Deliveries: by booked slot only, through the Delivery Gate on the south street. A banksman meets every vehicle at the gate and guides it to the Unloading Zone under the crane. In an emergency everyone meets at the Assembly Point on the green at the south-east corner of the site.

Destinos populares